CASE STUDY · RESTAURANT · GRAND LEDGE, MI
Anna’s House — Full Low Voltage Buildout
The Challenge
Anna’s House needed a complete low-voltage installation for their Grand Ledge restaurant, tying together the network infrastructure, kitchen display systems, TVs, wireless access, audio, POS connectivity, and surveillance cabling into one clean, serviceable build. The site required a large number of Cat6 home runs back to a new office rack location, multiple HDMI feeds for display mirroring, commercial display mounting, and reliable WiFi coverage throughout the restaurant.
The Solution
Wolverine Low Voltage provided a full structured cabling and systems installation package, including network rack buildout, Cat6 cabling, HDMI distribution, KDS display mounting, commercial audio, device installation, and UniFi network deployment.
One complete low-voltage deployment across the restaurant:
The Outcome
Anna’s House received a clean, organized, and scalable low-voltage backbone for restaurant operations. The completed system supports kitchen display workflows, POS connectivity, guest and staff wireless access, surveillance coverage, distributed audio, and centralized network management from a professionally built 16U rack. All cabling was labeled, tested, and routed back to the new office rack location, giving the Anna’s House team a reliable foundation that is easier to service, expand, and support long-term.